In November 2024, we at Pretec delivered 15 steel foundations to our customer Energi & Design, who carried out a contract for the installation of charging poles for a project here in Kungälv.

It feels especially rewarding to contribute to the development of charging infrastructure in our own hometown – and to do so in collaboration with another Kungälv-based company!

The project was carried out in Munkegärde, where Energi & Design was the main contractor and their client was HSB Brf Millestolpe. Groundwork was carried out by Kungälvs Entreprenad AB, and the project was completed on December 20, 2024.

Advantages of Pretec’s steel foundations

Mattias Fahlberg, project manager at Energi & Design, highlights several advantages of our foundations that make the work easier for both electrical installers and groundwork contractors:

  • Low weight – Significantly lighter than concrete foundations, making both transport and installation easier.
  • Flexible design – Larger and more feed-throughs at different heights allow for greater adaptability during installation.
  • Adjustability – The bolt system makes it easy to realign poles in the event of settlement, both during and after the project.
  • Easy repair – Damaged poles can be repaired by replacing bolts – without the need to dig up the foundation.
  • Stable installation – Clear instructions ensure a stable foundation in both asphalt and porous materials.
  • Fast delivery – Pretec’s stock availability makes it possible to start projects quickly when needed.

We would like to extend a big thank you to Energi & Design for an excellent collaboration, and we look forward to more exciting projects together!