Glued Laminated Timber Bridge Ängelholm
Contractor: GVV Gatu och Väg Väst
Location: Ängelholm
Year: 2023
In Ängelholm Municipality, a pedestrian and bicycle bridge was built in Haradal. The project is a turnkey contract carried out by our customer Gatu och Väg Väst, commissioned by Ängelholm Municipality.
The 87-metre-long glulam bridge creates a connection from the city centre to the west side across the Rönne River. The bridge weighs 80 tonnes and features two 20-metre-high pylons, each weighing 14 tonnes.
Pretec has had the privilege of supplying the large ASDO tie rods that adorn the bridge.
Photo: GVV Gatu och Väg Väst AB