Net Hanging at the Norway Line

Contractor: Opticon Rock AB
Location: Teåker
Year: 2024

Our customer Opticon Rock AB is working along the Norway Line outside Mellerud, where installing Pretec’s rock mesh was on the schedule.

The installation of mesh and bolts was carried out to protect against rocks falling onto the railway tracks.

In the project, Pretec’s rock eyes, wire, wire locks, and expansion anchors are also used to secure the rock mesh and prevent rockfalls onto the railway.

Relaterade projekt