New Metro -
Barkarby station

Contractor: Skanska
Location: Stockholm
Year: 2021-2026

In Stockholm, the New Metro is being built, where several existing lines are being extended, and one entirely new line with 10 new stations is planned.

The tunnels for the new Barkarby Station have now been opened between Akalla and Barkarby, with the final major tunnel blasting completed in January 2023. The station is being built underground and will feature two large entrances and a spacious platform area. Concrete work for the entire station is now underway.

We at Pretec have supplied ribbed steel bolts, as well as water and frost protection, for the Barkarby Station project.

Photo: Region Stockholm/White Arkitekter

Relaterade projekt