New Metro -
Gullmarsplan

Contractor: OHLA
Location: Stockholm
Year: 2020-2030

In Stockholm, the New Metro is being built, where several existing lines are being extended, and one entirely new line with 10 new stations is planned.

The platform for Gullmarsplan Station is being built 70 metres below ground level. Work is now underway on blasting down to the new platform.

Pretec is supplying ribbed steel bolts and PC bolts for the Gullmarsplan Station project.

Photo: Region Stockholm

Relaterade projekt