New Metro -
Hagastaden

Contractor: NCC
Location: Stockholm
Year: 2020-2025

In Stockholm, the New Metro is being built, where several existing lines are being extended, and one entirely new line with 10 new stations is planned.

For Hagastaden Station, a work tunnel has been blasted out leading to the future station. The blasting of the station’s new track tunnels and platform areas, which will be about 20 metres below ground level, is also ongoing.

Pretec is supplying ribbed steel bolts and PC bolts for the work at Hagastaden Station.

Photo: Region Stockholm/&Rundquist

Relaterade projekt