New Metro -
Sickla station

Contractor: CRTG Engineering
Location: Stockholm
Year: 2022-2030

In Stockholm, the New Metro is being built, where several existing lines are being extended, and one entirely new line with 10 new stations is planned.

The work on Sickla Station has included the construction of access tunnels, as well as drilling and blasting of track tunnels for the station, which is expected to take around three years. The work around Sickla Station takes place both above and below ground, about 35 metres down into the rock.

Pretec is supplying ribbed steel bolts and PC bolts for the project.

Photo: Region Stockholm/Sweco