New Metro -
Slakthusområdet

Contractor: OHLA
Location: Stockholm
Year: 2022-2034

In Stockholm, the New Metro is being built, where several existing lines are being extended, and one entirely new line with 10 new stations is planned.

The stations Slakthusområdet and Sockenplan are part of Stockholm’s Blue Line metro extension. Work is now underway with blasting and casting for both track and service tunnels from Sockenplan to Slakthusområdet. In Slakthusområdet, a new station is being built, with the platform located about 50 metres underground.

We at Pretec are supplying PC bolts and other rock products for the project.

Photo: Atrium Ljungberg/ Lundgaard & Tranberg Arkitekter

Relaterade projekt