The West Link - Haga
Contractor: Veidekke
Location: Gothenburg
Year: 2018-2026
In the Haga subsection for Korsvägen, a new underground station is being built.
The station will have two platforms and four tracks, along with a 1,700-metre-long tunnel, 250 metres of which will be a concrete tunnel built through soil and clay.
Pretec has signed a new agreement to supply rock reinforcement in the form of ribbed steel bolts for the project.