The West Link - Substage Kvarnberget

Contractor: Bohus Bergsprängning
Location: Gothenburg
Year: 2018-2026

Work on the Kvarnberget subsection of the West Link is in full swing. This section will be 560 metres long, with 200 metres built through rock and 360 metres through soil and clay.

The subsection runs from Lilla Bommen, past Packhuskajen, and to Stora Hamnkanalen. It is a large and complex project where the tunnel sections are being built as concrete tunnels. Work will continue for about five years above ground and then two years inside the tunnel.

Pretec has supplied many components to Bohus Bergsprängning, who are working and installing on the project.

Delivered products include lifting nuts, reinforcement, ribbed steel bolts, PC bolts, rock mesh, expansion anchors, wire, wire locks, as well as complete Gewi tie rods – both coated and uncoated.