Västberga Allé Bridge

Contractor: Hochtief
Location: Stockholm
Year: 2015-2017

In November 2015, construction began on a new road bridge for Västberga Allé.

The bridge is a pillar-free arch bridge approximately 100 meters long, featuring a wider pedestrian and bicycle path separated from vehicle traffic.

At Pretec, we supplied ASDO M160 tie rods with rolled threads.

Relaterade projekt