
Strengthened charging infrastructure in Kungälv
In November 2024, we delivered 15 steel foundations to Energi & Design, who installed charging poles for a project in Munkegärde, here in Kungälv.
It’s especially exciting to contribute to the development of charging infrastructure in our own hometown – and to do so in collaboration with another Kungälv-based company!
Why choose steel foundations from Pretec?
According to Mattias Fahlberg, Project Manager at Energi & Design, there were several advantages that made the work smoother for both electrical installers and ground contractors:
- Low weight – Much lighter than concrete, which simplifies transport and installation.
- Flexible design – Larger and multiple openings at different heights provide better adaptability.
- Adjustability – The bolt system makes it easy to realign poles in the event of ground settlement, both during and after construction.
- Easy repair – Damaged poles can be repaired by replacing the bolts – without the need to dig up the foundation.
- Stable installation – Clear instructions ensure a stable foundation, both in asphalt and porous materials.
- Fast delivery – Pretec’s in-stock availability allows projects to start immediately when needed.
A big thank you to Energi & Design for a great collaboration! We look forward to more projects together as we continue contributing to the development of charging infrastructure⚡

Framtidsdagen 2025
Don’t miss Framtidsdagen on September 25 – a meeting place for community building.

Flourishing initiative
How Pretec contributes to biodiversity – Anders Asp shares insights about the new initiative.

Visit to suppliers in Asia
An important part of our long-term sustainability and quality work!

Pretec is now listed in the
E-number database!
There you’ll find our most common products within E-mobility – making it easy to update your system!